Skip to content
Ready to moveRERA registeredApartment

Ivory Residences

Sector 150, NoidaKalindi Shelters

₹78.4 L – ₹1.99 Cr₹12,875/sq.ft onwards+5.7%

3.8% above the Sector 150 average of ₹12,400/sq.ft

Ivory Residences is a residential apartment development by Kalindi Shelters on Sector 150, Noida, spread across 18.2 acres with 1 tower and 72 units. The project keeps 59% of the site as open space, and publishes carpet, built-up and super built-up area separately for every configuration — the loading factor here runs to 1.33×, which is within the range we consider fair for this format. Builder floors and plotted development across west and north Delhi, moving into mid-rise since 2019.

Possession
Ready now

Ready now

Configurations
1–3 BHK

4 plans

Carpet from
445 sq.ft

RERA definition

Loading factor
1.33×

Within a fair range

Total units
72

1 block

Land area
18.2 acres

59% open space

₹78.4 L – ₹1.99 Cr

₹12,875/sq.ft

Configurations

The decision table. Sortable, with the best value in each column marked.

Areas are published in all three measures. The loading factor is the ratio you are actually paying against.

1 BHK

1 bath · North-East facing

90 available
Carpet
445 sq.ft
Super built-up
588 sq.ft
Loading
1.32×
₹/sq.ft
₹13,336

₹78.4 L – ₹85.9 L

2 BHK

2 bath · South facing

19 available
Carpet
720 sq.ft
Super built-up
923 sq.ft
Loading
1.28×
₹/sq.ft
₹13,627

₹1.26 Cr – ₹1.32 Cr

2 BHK

2 bath · North-East facing

16 available
Carpet
810 sq.ft
Super built-up
1,079 sq.ft
Loading
1.33×
₹/sq.ft
₹13,097

₹1.41 Cr – ₹1.47 Cr

3 BHK

3 bath · West facing

70 available
Carpet
1,105 sq.ft
Super built-up
1,417 sq.ft
Loading
1.28×
₹/sq.ft
₹12,875

₹1.82 Cr – ₹1.99 Cr

Prices are the builder's quoted base on super built-up area and exclude floor rise, preferential location charges, car parking, club membership, GST, stamp duty and registration. Starting price at this project: ₹78.4 L.

Price history

Every revision we have recorded, with the source of each.

1 BHK, 588 sq.ft · quoted ₹/sq.ft, last 8 quarters

₹13,394+6.1% since Dec 2024

12,25013,00013,75013,394
Dec 2024Sept 2026

₹13,394/sq.ft· Sept 2026· source: Builder price list

Price records are append-only: a revision closes the previous record and opens a new one, so nothing on this chart can be rewritten later. Rates are the builder's quoted base and exclude floor rise and PLC.

Amenities · 10

Grouped by category. 59% of the site is open space.

Leisure

  • Swimming pool
  • Amphitheatre
  • Clubhouse

Sports & fitness

  • Gymnasium
  • Sports court

Parking & transport

  • EV charging
  • Visitor parking

Safety

  • 24×7 security

Convenience

  • Co-working lounge

Kids

  • Crèche

Master plan & floor plans

Zoomable, with a scale reference.

100%
10 ft

1 BHK

₹78.4 L – ₹85.9 L

Carpet area
445 sq.ft
Built-up area
505 sq.ft
Super built-up
588 sq.ft
Loading factor
1.32×
Bathrooms
1
Balconies
1
Facing
North-East
Floors offered
1–13

Location

Distances measured on road, drive times typical off-peak.

Ivory Residences

28.5763° N, 77.3863° E

35, Sector 150, Noida, Uttar Pradesh 201323

Walkabilitydaily needs on foot
57%
Transit accessmetro, rail and bus
72%

What is nearby

  • Metro interchangeMetro2.7 km9 min
  • Heritage Public SchoolSchool3.4 km11 min
  • Meridian ClinicHospital1.1 km4 min
  • Metropolis MallMall4.1 km13 min
  • Techspace OneTech park1.3 km4 min
  • Indira Gandhi International AirportAirport36.6 km59 min

Connectivity from Sector 150, Noida

  • Distances are measured on road, not as the crow flies.
  • Drive times are typical off-peak, not best case.

Specifications

What is actually being built, by category.

Structure

Frame
RCC framed structure designed for seismic zone II compliance
Walls
Solid concrete block masonry, 200 mm external and 100 mm internal
Ceiling height
3.05 m floor to floor, 2.85 m clear in living areas

Flooring

Living & dining
800 × 1600 mm double-charged vitrified tile
Bedrooms
600 × 1200 mm vitrified tile with matching skirting
Balconies
Anti-skid ceramic tile
Common lobbies
Granite in ground lobby, vitrified tile on typical floors

Kitchen

Counter
Polished granite counter with stainless steel sink
Dado
Ceramic tile dado to 600 mm above counter
Provisions
Points for water purifier, chimney, hob and dishwasher

Doors & windows

Main door
Engineered hardwood frame with veneer shutter and digital lock
Internal doors
Hardwood frame with moulded skin shutters
Windows
UPVC sliding with mosquito mesh provision and safety grille

Electrical

Wiring
Concealed FR copper wiring with modular switches
Backup
DG backup for common areas and one light circuit per unit
EV
Conduit provision to 30% of covered car parks

Bathrooms

Sanitaryware
Wall-hung EWC with concealed cistern, single-lever CP fittings
Water heating
Geyser point in all bathrooms, solar pre-heat riser
Ventilation
Exhaust fan provision, false ceiling in wet areas

Painting

Internal
Two coats of acrylic emulsion over putty
External
Textured exterior-grade weatherproof paint

RERA & approvals

Phase-wise registration, authority and validity.

Whole project

UP RERA

RERA registered
Registration
UPRERAPRJ197488
Valid till
5 May 2026

The completion date lodged with the authority is the legally enforceable one, and it is often later than the date in marketing material. Check the registration on the authority's portal before paying a booking amount.

Construction updates

Reverse-chronological, dated, photographed.

  1. Snagging and handover readiness

    100% complete

    5 September 2026

    Work is tracking the published schedule. No revision to the committed handover date this quarter.

  2. Landscaping and hardscape started

    86% complete

    5 June 2026

    Work is tracking the published schedule. No revision to the committed handover date this quarter.

  3. Lift installation and testing

    71% complete

    5 March 2026

    Work is tracking the published schedule. No revision to the committed handover date this quarter.

  4. Clubhouse shell complete

    57% complete

    5 January 2026

    Labour strength increased on site this month to hold the finishing schedule.

  5. Internal plastering underway

    43% complete

    5 October 2025

    Monsoon slowed external work by roughly two weeks; internal trades continued without interruption.

  6. Tower A structure at 12th floor

    29% complete

    5 August 2025

    Monsoon slowed external work by roughly two weeks; internal trades continued without interruption.

The builder

Delivery record is the number worth reading on a date two years out.

Questions buyers ask about this project

Ivory Residences is quoted at the range shown above across its 1–3 BHK inventory. Rates are per super built-up area and exclude floor rise, preferential location charges, registration and GST. The price history on this page shows every revision we have recorded.

Similar projects in Sector 150

Same locality first, then the same budget band, then the same builder.

All in Sector 150
Nearing possession

Cadence Sanctuary 2

0.4%

Sector 150 · Ashoka Buildwell

₹79.8 L – ₹2.07 Cr₹14,023/sq.ft
Config
1–3 BHK
Carpet from
445 sq.ft
Loading
1.27×

Q4 2026128 units13 amenities

New launchRERAFeatured

Palladio Vista 2

+2.9%

Sector 150 · Sanchita Estates

₹89.4 L – ₹2.2 Cr₹13,052/sq.ft
Config
1–3 BHK
Carpet from
445 sq.ft
Loading
1.49×

Q4 2028618 units13 amenities

New launchRERA

Riverstone Vista

+5.0%

Sector 150 · Havelock Group

₹1.29 Cr – ₹1.45 Cr₹13,111/sq.ft
Config
2 BHK
Carpet from
720 sq.ft
Loading
1.30×

Q4 2029170 units15 amenities

New launchRERA

Palladio Court

+0.9%

Sector 150 · Silverline Landmarks

₹1.33 Cr – ₹2.65 Cr₹13,184/sq.ft
Config
2–3 BHK
Carpet from
720 sq.ft
Loading
1.45×

Q3 2030889 units11 amenities

Nearing possessionRERA

Kanopy Quarters 2

+5.1%

Sector 150 · Ashoka Buildwell

₹1.55 Cr – ₹2.1 Cr₹14,029/sq.ft
Config
2–3 BHK
Carpet from
810 sq.ft
Loading
1.36×

Q1 2027324 units10 amenities

Ready to moveRERA

Riverstone Pavilion

+3.5%

Noida Expressway · Nirvaan Habitat

₹73.8 L – ₹1.23 Cr₹11,506/sq.ft
Config
1–2 BHK
Carpet from
445 sq.ft
Loading
1.44×

Ready now675 units14 amenities

Figures on this page are the builder's published quotes as recorded on Jul 2026 and revised since. Base prices exclude floor rise, preferential location charges, car parking, club membership, GST, stamp duty and registration — assembled, these routinely add 18–25%. Starting price shown: ₹78.4 L. Possession is complete against the date registered with UP RERA.