Skip to content
Nearing possessionRERA registeredRow house

Alcove Yard

Rohini, DelhiRathore Constructions

₹1.16 Cr – ₹2.22 Cr₹11,734/sq.ft onwards1.0%

4.8% above the Rohini average of ₹11,200/sq.ft

Alcove Yard is a row house development by Rathore Constructions on Rohini, Delhi, spread across 3.6 acres with 1 phase and 214 units. The project keeps 78% of the site as open space, and publishes carpet, built-up and super built-up area separately for every configuration — the loading factor here runs to 1.33×, which is within the range we consider fair for this format. Volume builder with the widest price ladder — studio inventory through penthouses inside the same township.

Possession
Q2 2027

8 months away

Configurations
2–3 BHK

4 plans

Carpet from
720 sq.ft

RERA definition

Loading factor
1.33×

Within a fair range

Total units
214

1 block

Land area
3.6 acres

78% open space

₹1.16 Cr – ₹2.22 Cr

₹11,734/sq.ft

Configurations

The decision table. Sortable, with the best value in each column marked.

Areas are published in all three measures. The loading factor is the ratio you are actually paying against.

2 BHK

2 bath · North facing

36 left
Carpet
720 sq.ft
Super built-up
921 sq.ft
Loading
1.28×
₹/sq.ft
₹12,597

₹1.16 Cr – ₹1.25 Cr

2 BHK

2 bath · West facing

41 available
Carpet
810 sq.ft
Super built-up
1,076 sq.ft
Loading
1.33×
₹/sq.ft
₹11,734

₹1.26 Cr – ₹1.32 Cr

3 BHK

3 bath · North facing

27 available
Carpet
1,105 sq.ft
Super built-up
1,414 sq.ft
Loading
1.28×
₹/sq.ft
₹12,381

₹1.75 Cr – ₹1.85 Cr

3 BHK

3 bath · East facing

14 available
Carpet
1,240 sq.ft
Super built-up
1,635 sq.ft
Loading
1.32×
₹/sq.ft
₹12,719

₹2.08 Cr – ₹2.22 Cr

Prices are the builder's quoted base on super built-up area and exclude floor rise, preferential location charges, car parking, club membership, GST, stamp duty and registration. Starting price at this project: ₹1.16 Cr.

Price history

Every revision we have recorded, with the source of each.

2 BHK, 921 sq.ft · quoted ₹/sq.ft, last 8 quarters

₹12,5461.0% since Dec 2024

12,25012,62513,00012,546
Dec 2024Sept 2026

₹12,546/sq.ft· Sept 2026· source: Builder price list

Price records are append-only: a revision closes the previous record and opens a new one, so nothing on this chart can be rewritten later. Rates are the builder's quoted base and exclude floor rise and PLC.

Amenities · 10

Grouped by category. 78% of the site is open space.

Sports & fitness

  • Yoga deck
  • Gymnasium
  • Jogging track
  • Sports court

Leisure

  • Swimming pool
  • Senior citizens' court
  • Clubhouse

Convenience

  • Power backup
  • Co-working lounge

Environment

  • Solar common lighting

Master plan & floor plans

Zoomable, with a scale reference.

100%
10 ft

2 BHK

₹1.16 Cr – ₹1.25 Cr

Carpet area
720 sq.ft
Built-up area
804 sq.ft
Super built-up
921 sq.ft
Loading factor
1.28×
Bathrooms
2
Balconies
1
Facing
North
Floors offered
1–20

Location

Distances measured on road, drive times typical off-peak.

Alcove Yard

28.5914° N, 77.1510° E

5, Rohini, Delhi, Delhi NCT 110059

Walkabilitydaily needs on foot
43%
Transit accessmetro, rail and bus
87%

What is nearby

  • Metro interchangeMetro1.3 km4 min
  • Springdale AcademySchool5 km16 min
  • Meridian ClinicHospital4.5 km15 min
  • Crestpoint MallMall2 km6 min
  • Techspace OneTech park3.1 km10 min
  • Indira Gandhi International AirportAirport34.1 km55 min

Connectivity from Rohini, Delhi

  • Distances are measured on road, not as the crow flies.
  • Drive times are typical off-peak, not best case.

Specifications

What is actually being built, by category.

Structure

Frame
RCC framed structure designed for seismic zone II compliance
Walls
Solid concrete block masonry, 200 mm external and 100 mm internal
Ceiling height
3.05 m floor to floor, 2.85 m clear in living areas

Flooring

Living & dining
800 × 1600 mm double-charged vitrified tile
Bedrooms
600 × 1200 mm vitrified tile with matching skirting
Balconies
Anti-skid ceramic tile
Common lobbies
Granite in ground lobby, vitrified tile on typical floors

Kitchen

Counter
Polished granite counter with stainless steel sink
Dado
Ceramic tile dado to 600 mm above counter
Provisions
Points for water purifier, chimney, hob and dishwasher

Doors & windows

Main door
Engineered hardwood frame with veneer shutter and digital lock
Internal doors
Hardwood frame with moulded skin shutters
Windows
UPVC sliding with mosquito mesh provision and safety grille

Electrical

Wiring
Concealed FR copper wiring with modular switches
Backup
DG backup for common areas and one light circuit per unit
EV
Conduit provision to 30% of covered car parks

Bathrooms

Sanitaryware
Wall-hung EWC with concealed cistern, single-lever CP fittings
Water heating
Geyser point in all bathrooms, solar pre-heat riser
Ventilation
Exhaust fan provision, false ceiling in wet areas

Painting

Internal
Two coats of acrylic emulsion over putty
External
Textured exterior-grade weatherproof paint

RERA & approvals

Phase-wise registration, authority and validity.

Whole project

Delhi RERA

RERA registered
Registration
DLRERA2026P288340
Valid till
5 November 2027

The completion date lodged with the authority is the legally enforceable one, and it is often later than the date in marketing material. Check the registration on the authority's portal before paying a booking amount.

Construction updates

Reverse-chronological, dated, photographed.

  1. Landscaping and hardscape started

    82% complete

    5 September 2026

    Monsoon slowed external work by roughly two weeks; internal trades continued without interruption.

  2. External painting on Tower B

    68% complete

    5 June 2026

    Labour strength increased on site this month to hold the finishing schedule.

  3. Clubhouse shell complete

    55% complete

    5 March 2026

    Work is tracking the published schedule. No revision to the committed handover date this quarter.

  4. Internal plastering underway

    41% complete

    5 December 2025

    Monsoon slowed external work by roughly two weeks; internal trades continued without interruption.

  5. Tower A structure at 12th floor

    27% complete

    5 October 2025

    Work is tracking the published schedule. No revision to the committed handover date this quarter.

The builder

Delivery record is the number worth reading on a date two years out.

Questions buyers ask about this project

Alcove Yard is quoted at the range shown above across its 2–3 BHK inventory. Rates are per super built-up area and exclude floor rise, preferential location charges, registration and GST. The price history on this page shows every revision we have recorded.

Similar projects in Rohini

Same locality first, then the same budget band, then the same builder.

All in Rohini
Pre-launchRERA

Aranya Yard

+0.8%

Rohini · Ridgeline Developers

₹1.15 Cr – ₹1.55 Cr₹11,222/sq.ft
Config
2–3 BHK
Carpet from
810 sq.ft
Loading
1.26×

Q3 2030208 units9 amenities

Pre-launchRERA

Meridian Quarters

1.4%

Rohini · Northgate Terra

₹1.23 Cr – ₹2.42 Cr₹11,397/sq.ft
Config
2–3 BHK
Carpet from
720 sq.ft
Loading
1.49×

Q3 202989 units11 amenities

Under constructionRERA

Solstice Greens 2

2.1%

Rohini · Kalindi Shelters

₹1.06 Cr – ₹1.61 Cr₹10,584/sq.ft
Config
2–3 BHK
Carpet from
720 sq.ft
Loading
1.35×

Q1 2028132 units10 amenities

Nearing possessionRERA

Solstice Enclave

+5.6%

Rohini · Trellis Realty

₹66 L – ₹1.73 Cr₹10,038/sq.ft
Config
1–3 BHK
Carpet from
445 sq.ft
Loading
1.49×

Q2 202766 units12 amenities

Nearing possessionRERA

Halcyon Enclave

+1.4%

Dwarka · Rathore Constructions

₹1.3 Cr – ₹1.54 Cr₹12,804/sq.ft
Config
2 BHK
Carpet from
720 sq.ft
Loading
1.39×

Q1 2027657 units10 amenities

Pre-launchRERA

Alcove Greens

+1.3%

Dwarka · Northgate Terra

₹1.15 Cr – ₹1.88 Cr₹11,942/sq.ft
Config
2–3 BHK
Carpet from
720 sq.ft
Loading
1.39×

Q2 20291,054 units10 amenities

Figures on this page are the builder's published quotes as recorded on Jan 2026 and revised since. Base prices exclude floor rise, preferential location charges, car parking, club membership, GST, stamp duty and registration — assembled, these routinely add 18–25%. Starting price shown: ₹1.16 Cr. Possession is 8 months out against the date registered with Delhi RERA.